Button BPM development and prototyping for ALBA II

Read full text
Authors: Laura Torino, José María Álvarez, Ubaldo Iriso, Oriol Traver Ramos
Cited by: 0

Abstract

As part of the ongoing ALBA II upgrade, which aims to significantly enhance the performance of the ALBA Synchrotron Light Source, a new design for button Beam Position Monitors (BPMs) is under investigation. In this contribution, we present the results of a characterization study conducted on button prototypes supplied by two different manufacturers. Furthermore, we introduce the preliminary design of an alternative button BPM intended for direct welding to the copper vacuum chamber of the upgraded machine.

Fields of Study & Subjects

Particle accelerators and beam dynamics Particle Accelerators and Free-Electron Lasers Particle Detector Development and Performance

Publication details

Journal / source
JACOW
Publication date
20 January 2026
Language
EN