As-built front ends for the Advanced Photon Source MBA upgrade

Read full text Summarise with VIRAT
Authors: Yifei R. Jaski, Frank Westferro, Samuel Oprondek, Mark Erdmann, Clute,Tim, Mohan Ramanathan
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

The Advanced Photon Source (APS) upgrade from double-bend achromats (DBA) to multi-bend achro-mats (MBA) lattice is completed. All storage ring components and front ends were installed between April 2023 to April 2024 and fully commissioned. Some major changes have been made on front ends since our last front end design paper published in MEDSI2018 proceedings. The changes are: 1) Removed clearing magnet from all front ends, 2) Incorporated a Burn-Through-Mask (BTM) as the first fixed mask for all Insertion Device (ID) front ends, 3) Added a new-design diamond window to replace beryllium window for windowed High Heat Load Front End (HHLFE). The upgraded APS front ends will only have three types: a) HHLFE for single beam, b) Canted Front End (CFE) for canted beam, c) Bending Magnet Front End (BMFE) for bending magnet beam. This paper presents the as-built version of all three types of front ends.

Fields of Study & Subjects

Particle Accelerators and Free-Electron Lasers Particle accelerators and beam dynamics Crystallography and Radiation Phenomena

Publication details

Journal / source
JACOW
Publication date
2 April 2026
Language
EN