Survey and alignment of beamlines for Advanced Photon Source Upgrade

Read full text Summarise with VIRAT
Authors: Altaf Khan, Jonathan Knopp, Mark Erdmann, O. A. Schmidt
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

As part of the Advanced Photon Source Upgrade (APS-U) Project, all 72 beamlines needed to undergo alignment to the new storage ring installation. Prior to beginning the alignment efforts, beamline geometry files were to identify the location of components with respect to the beam source. For new beamline installations, the remaining process was simpler. New components were fiducialized in a lab, along with their support tables. Tables were then installed and aligned to the beamline geometry configuration and a final report was generated for approval. However, for existing beamlines, the process was more intricate. Fiducial records dating back to 1996 were used to generate fiducial files. However, some information was lost over the years. In response, new techniques were implemented to fiducialize components missing records in-situ to avoid removing components from the beamline. Existing component positions were measured with respect to the new source, then realigned. A report of pre-alignment and a report of realignment were generated for approval. All beamlines have undergone realignment in one year timeline and successfully gone through commissioning process.

Fields of Study & Subjects

Particle accelerators and beam dynamics Particle Accelerators and Free-Electron Lasers Advanced Measurement and Metrology Techniques

Publication details

Journal / source
JACOW
Publication date
2 April 2026
Language
EN