A beam chopping scheme concept for the new LAMP MEBT

Read full text
Authors: Salvador Sosa Güitrón, Dimitre A. Dimitrov, Dmitry Gorelov, Gregory E. Dale, Haoran Xu, Mr. Janardan Prasad Upadhyay, John W. Lewellen IV, K. Bishofberger, Lawrence Rybarcyk, Sergey S. Kurennoy
Cited by: 0

Abstract

As part of the LANSCE Accelerator Modernization Project (LAMP), the two existing 750-keV Cockcroft Waltons are planned to be replaced by a single radio-frequency quadrupole (RFQ). The new LAMP front-end needs to deliver beams with similar timing patterns to what is currently delivered to the multiple target stations. To accomplish this, the 3-MeV Medium Energy Beam Transport (MEBT) is designed with two choppers that help produce beam timing patterns required by the experimental user facilities. The new RFQ will introduce satellite bunches around the single high-intensity bunch that is required by the users. These satellite bunches need to be removed in the MEBT. This contribution describes the design of LAMP MEBT with a beam chopping scheme and presents simulation results.

Fields of Study & Subjects

Particle accelerators and beam dynamics Particle Accelerators and Free-Electron Lasers Pulsed Power Technology Applications

Publication details

Journal / source
JACOW
Publication date
29 January 2026
Language
EN