Improvements to the LANSCE CCL klystron evaluation

Read full text
Authors: Aditya Waghmare, Cooper Richman, William Haynes
Cited by: 0

Abstract

This paper describes the existing procedure for LANSCE 805 MHz klystrons testing and evaluation and realized avenues for improvement. Each of the 1.25 MW klystrons used for powering LANSCE CCL (side Coupled Cavity Linac) are tested during first installation or fol-lowing a fault in operations. Executed testing process includes high potting, pulsing, and full power RF testing. Generated testing data is used for evaluation and certifi-cation of spare units for the linac. In this paper, we hope to breakdown this expert-dependent, lengthy 1–2 month process and examine improvements which can accelerate time to evaluation. The goal of this paper is to fully cap-ture the current procedures and investigate improvements to modernize our legacy systems and processes.

Fields of Study & Subjects

Particle accelerators and beam dynamics Gyrotron and Vacuum Electronics Research Particle Accelerators and Free-Electron Lasers

Publication details

Journal / source
JACOW
Publication date
29 January 2026
Language
EN