LLRF commissioning of the CEBAF C75 upgrades SAM 2024/25
Abstract
An often-overlooked aspect of Low Level Radio Frequency (LLRF) design is commissioning of a new system. During Jlab’s Scheduled Accelerator Maintenance (SAM) in 2024, two C75 Cryomodule were installed in CEBAF with Jlab’s LLRF 3.0 system. Jlab’s team has invested effort in automating and standardizing their commissioning process. Several key components are klystron characterization, cavity characterization, and interlock verification. This poster will present the summary of LLRF preparation and commissioning efforts at Jlab.
Fields of Study & Subjects
Particle accelerators and beam dynamics
Particle Accelerators and Free-Electron Lasers
Gyrotron and Vacuum Electronics Research