Data Centers Gap Analysis [Slides]

Read full text
Authors: USDOE Grid Deployment Office (GDO), Ellie Estreich, USDOE Office of Critical Minerals and Energy Innovation (CMEI), Luke Lavin, Ilya Chernyakhovskiy
Cited by: 0

Abstract

Data centers and other large loads are a significant driver of unprecedented, near-term demand growth in the United States. Power system planners, utilities, regulators, and other stakeholders are grappling with how to integrate data centers on the system without comprising reliability, resiliency, and energy affordability. NLR is pursuing work to develop a siting and decision-making tool that would draw on power systems modeling expertise to achieve granular representation of trade-offs involved in data center sitting and development. This slide deck supports the same workstream by reviewing the literature to identify mitigation options to facilitate near-term integration of large loads and by presenting options for pursuing data development and/or modeling projects to improve representation of siting options.

Fields of Study & Subjects

Electric Power System Optimization Optimal Power Flow Distribution Integrated Energy Systems Optimization

Publication details

Journal / source
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
Publication date
5 February 2026
Language
EN