Modern chalanges in construction relations in Ukraine during wartime and post-war periods
Summary
No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.
Summarise with VIRAT Free to try with your Science Catalogs account.Abstract
The article is devoted to a comprehensive analysis of modern challenges in the legal regulation of construction relations in Ukraine under the martial law and at the stage of transition to post-war reconstruction period. The relevance of the study is determined by the unprecedented scale of material losses and the urgent need for a scientifically grounded approach to legal regulation of national infrastructure restoration processes. The Fifth Rapid Damage and Needs Assessment (RDNA5), published in February 2026, estimates the total cost of reconstruction at 588 billion dollars, which is nearly three times Ukraine’s projected GDP for 2025. The research is based on the synthesis of empirical data from international organizations (World Bank, UNDP, KSE Institute) and comparative analysis of global post-war reconstruction experience. The article identifies five critical challenges: catastrophic infrastructure destruction (72% of damages concentrated in six oblasts), critical labor shortage (30-40% deficit of specialists, 2.4 vacancies per candidate), massive mine contamination (142,000 km² of potentially hazardous territories), systemic energy crisis (loss of over 50% of pre-war generating capacities), and significant financial gap (only 43% of 2025 needs covered). Special attention is given to the labor challenge as the most acute and least financially solvable factor limiting the construction industry’s capacity to respond to growing demand. It is argued that without doubling the construction workforce by 2032, reconstruction will be slowed by 50-70% even with full financing of its needs. Demining is identified as a critical prerequisite for any reconstruction in 72% of the most affected regions where major damages are concentrated. The article substantiates the necessity of integrating five strategic priorities into legal regulation: creation of a unified reconstruction coordination body, large-scale construction workforce training program, accelerating demining through international coordination, priority restoration of energy infrastructure, and implementation of transparency of anticorruption mechanisms. The practical significance of the research lies in developing specific recommendations for improving legislation in the field of construction relations at the stage of transition from wartime to post-war period.
Fields of Study & Subjects
Construction Management and Sustainability
Ukrainian Legal and Forensic Studies
Economic Issues in Ukraine
Publication details
- Journal / source
- Uzhhorod National University Herald Series Law
- Volume
- 5
- Issue
- 93
- Pages
- 484–490
- Publication date
- 31 March 2026
- Language
- EN