Safety Challenges in Optimising IBS Precast and Lifting Machinery: Insights from Malaysian Construction Stakeholders

Read full text
Authors: Muhamad Yusof Abdullah, Ani Saifuza Abd Shukor, Rohana Mahbub
Cited by: 0

Abstract

This study examines the challenges associated with optimising Industrialised Building Systems (IBS) and lifting Machinery that impact safety within the Malaysian construction Industry. To optimise the IBS precast, a comprehensive strategy is required for both the concrete processing area and the line processing area, such as the Rebar processing area. Developing hypotheses about the impact of optimisation is aided by the ongoing adoption of underlying ideas, such as Design for Manufacturing and Assembly (DfMA), in the context of safety challenges. The primary objective is to identify any safety concerns with IBS precast goods and the lifting apparatus in the IBS prefabricated processing area. Eight people in Selangor and Johor responded to semi-structured interviews after twelve invitations were sent out for a preliminary survey and collected by using snowball sampling. The results and findings that concentrate on the theme in the safety issues are Material Handling Hazard, Standardisation & Operation Capacity, and Lifting Machinery Safety Gap, which have consequences for worker safety training for the IBS precast products and lifting machinery operations.

Fields of Study & Subjects

Occupational Health and Safety Research BIM and Construction Integration Construction Engineering and Safety

Publication details

Journal / source
Built Environment Journal
Volume
23
Issue
1
Publication date
1 January 2026
Language
EN