Optimization of a hybrid power supply system for the round-the-clock medical center: An economic analysis using HOMER PRO

Read full text Summarise with VIRAT
Authors: Дееб Али, A. N. Doroshin, Muhammad Deeb
Cited by: 0
References: 15

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

The article is devoted to the study of the optimal use of a hybrid energy system, including solar and wind installations, a diesel generator, as well as a geothermal heat pump, to provide electricity and hot water to a medical center located in the city of Salmiya (Syria). This region is remote and is experiencing an acute shortage of electricity.The system was modeled and optimized using HOMER PRO software. The calculations took into account a variable daily load of 60 kWh and a peak power consumption of 5.9 kW. Solar and wind sources provide the base load, while a diesel generator is used during periods of low generation. The geothermal heat pump provides hot water supply with high energy efficiency. The study analyzed the technical and economic efficiency of the proposed solution. The results show that using a hybrid system can significantly reduce operating costs and increase the reliability of energy supply in remote regions.

Fields of Study & Subjects

Hybrid Renewable Energy Systems Integrated Energy Systems Optimization Power Systems and Renewable Energy

Publication details

Journal / source
Omsk Scientific Bulletin Series Aviation-Rocket and Power Engineering
Volume
10
Issue
1
Pages
39–48
Publication date
31 March 2026
Language
EN