Research on Countermeasures for the Three Gorges Hub Transshipment
Abstract
To cope with the capacity gap caused by the construction of the Three Gorges new waterway project, a research on the countermeasures for transshipment during the construction period is carried out. We started with the transshipment infrastructure, analyzed its adaptability, and calculated the transshipment costs and critical points for different cargo types and routes. The study shows that there is still a certain gap between the current overall capacity of the transshipment system and the transshipment demand during construction. When the waiting time for commercial vehicle-carrying ships, container ships, and bulk cargo ships increase to 16 days, 22 days, and 25 days respectively, the cost of ships queuing to pass the dam exceeds the transportation cost of turning over the dam, using route1 to transshipment is more economical and time-efficient.
Fields of Study & Subjects
Maritime Ports and Logistics
Physical Activity and Education Research
Blasting Impact and Analysis
Publication details
- Journal / source
- Advances in transdisciplinary engineering
- Publication date
- 8 January 2026
- Document type
- Book chapter