Numerical Simulation Study on the Influencing Factors of Water Inflow in Subsea Tunnels

Read full text
Authors: Liyang Bai, Yingnian Yu, Hui Xuan Geng
Cited by: 1
References: 32

Abstract

The construction of undersea tunnels involves multiple potential hazards, among which water-related risks are particularly critical during the construction phase. Tunnel water inrush can trigger serious safety incidents and increase maintenance costs during operation. Therefore, accurately predicting water inflow is essential to ensure construction safety and long-term operational reliability. This study calculated the water inflow per meter of an undersea tunnel using the built-in FISH programming language in FLAC3D 7.0 finite difference software. A series of numerical models was established to examine the effects of eight influencing factors, including seawater depth, permeability of the surrounding rock, overburden thickness, and the thickness and permeability coefficients of both the grouting ring and the lining. The results indicate that water inflow generally increases linearly with greater seawater depth and overburden thickness. Although higher permeability of the surrounding rock leads to increased inflow, the growth rate gradually decreases. When the thickness of the grouting ring exceeds 6 m, the marginal benefit of its effect gradually decreases. The inflow was found to decrease as the lining permeability declined, with a more evident reduction under higher grouting ring permeability. Sensitivity analysis further revealed that seawater depth exerts the most significant influence on water inflow, whereas the thickness of the grouting ring has the least effect.

Fields of Study & Subjects

Geotechnical Engineering and Analysis Grouting Rheology and Soil Mechanics Rock Mechanics and Modeling

Publication details

Journal / source
Applied Sciences
Publisher
MDPI AG
Volume
16
Issue
2
Pages
774–774
Publication date
12 January 2026
Language
EN