Passenger-Oriented Interim-Period Train Timetable Synchronization Optimization for Urban Rail Transit Network

Read full text
Authors: Yan Xu, Haoran Liang, Ziwei Jia, Minghua Li, Jiaxin Bai, Qiyu Liang
Cited by: 1
References: 29

Abstract

Interim periods between peak and off-peak operations in urban rail transit networks often suffer from mismatched headways across lines, which increases passenger transfer waiting and operating costs. This paper proposes a passenger-oriented timetable synchronization method for network-wide interim period train service. In this study, based on the AFC data, passengers are assigned to the shortest travel time paths, and passenger transfer flows are linked to connecting train pairs by consideration of the maximum acceptable waiting time. As a result, the transfer waiting time is accurately calculated by matching passengers’ platform arrival times with the departures of feasible connecting trains. A mixed integer nonlinear programming model then jointly optimizes departure headways at each line’s first station, arrival and departure times at transfer stations, subject to safety headways and time bounds. The objective minimizes total cost, combining transfer waiting time cost and train operating cost (depreciation and distance-related cost). A simulated-annealing-based genetic algorithm (SA-GA) is designed to solve the NP-hard problem. A case study on the Nanjing rail transit network from 6:30 to 7:30 reduces total cost by 6.88%, including 3.77% lower transfer waiting time cost and 14.49% lower operating cost, and shows stable results under typical transfer demand fluctuations.

Fields of Study & Subjects

Railway Systems and Energy Efficiency Transportation Planning and Optimization Transport and Economic Policies

Publication details

Journal / source
Applied Sciences
Publisher
MDPI AG
Volume
16
Issue
2
Pages
1103–1103
Publication date
21 January 2026
Language
EN