Improved Sequential Starting of Medium Voltage Induction Motors with Power Quality Optimization Using White Shark Optimizer Algorithm (WSO)

Read full text Summarise with VIRAT
Authors: Amr Refky, Eman M. Abdallah, Hamdy Shatla, Mohammed E. Elfaraskoury
Cited by: 0
References: 29

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

Medium voltage induction motors (MVIM) are a key component of numerous industries, such as water treatment plants, sewage discharge stations, and chilled water systems. The starting process for these MV motors is critical as it is associated with a major impact on both motor lifetime and power grid quality. In this article, a proposed modified and comprehensive starting scheme of MV three-phase induction motors driving pumps for water stations is introduced. Firstly, the starting performance and its impact on power grid quality will be discussed when all motors are normally started with direct on line connection (DOL), which is already the normal established status. A modified starting scheme based on an optimized coordination of motor starting methods in addition to variable voltage variable frequency drive (VVVFD) drive and control implementation will be discussed. A transition between the starting of variant MV induction motors as well as the starting event coordination principle will be discussed to improve the power quality relative to the obligatory time shift required for the operation. The coordination is based on an algorithm implementation which is achieved using different optimization concepts based on artificial intelligence techniques, properly conducting the transition time in addition to the power delivered by the inverter unit rather than determining the number of DOL and VVVF-implemented motors. A comparison between using the optimized VVVFD soft-starting and the proposed modified scheme is performed, focusing on the power quality improvement rather than optimizing the cost function. The modified scheme is simulated using ETAP power station for brief analysis and study of load flow rather than the complete inspection and power quality assessment.

Fields of Study & Subjects

Power Quality and Harmonics Electric Power Systems and Control Electric Motor Design and Analysis

Publication details

Journal / source
Electricity
Volume
7
Issue
2
Pages
33–33
Publication date
2 April 2026
Language
EN