Bi-Objective Intraday Coordinated Optimization of a VPP’s Reliability and Cost Based on a Dual-Swarm Particle Swarm Algorithm

Read full text
Authors: Jun Zhan, Xiaojia Sun, Yang Li, Wenjing Sun, Jiamei Jiang, Yang Gao
Cited by: 2
References: 6

Abstract

With the increasing penetration of renewable energy, power systems are facing greater uncertainty and volatility, which poses significant challenges for Virtual Power Plant scheduling. Existing research mainly focuses on optimizing economic efficiency but often overlooks system reliability and the impact of forecasting deviations on scheduling, leading to suboptimal performance. Thus, this paper presents a reliability-cost bi-objective cooperative optimization model based on a dual-swarm particle swarm algorithm: it introduces positive and negative imbalance price penalty factors to explicitly describe the economic costs of forecast deviations, constructs a reliability evaluation system covering PV, EVs, air-conditioning loads, electrolytic aluminum loads, and energy storage, and solves the multi-objective model via algorithm design of “sub-swarms specializing in single objectives + periodic information exchange”. Simulation results show that the method ensures stable intraday operation of VPPs, achieving 6.8% total cost reduction, 12.5% system reliability improvement, and 14.8% power deviation reduction, verifying its practical value and application prospects.

Fields of Study & Subjects

Power System Reliability and Maintenance Electric Power System Optimization Smart Grid Energy Management

Publication details

Journal / source
Energies
Publisher
MDPI AG
Volume
19
Issue
2
Pages
473–473
Publication date
17 January 2026
Language
EN