A Multi-Source Multi-Timescale Cooperative Dispatch Optimization
Abstract
To address the power and energy balancing challenges faced by high-penetration renewable energy systems under long-term intermittent output conditions, this study proposes a multi-source, multi-timescale collaborative dispatch strategy (2MT-S) integrating wind, solar, hydro, thermal, and hydrogen energy resources. First, a long-term-to-day-ahead coupled scheduling framework is established based on intermittent output duration forecasts (3-day/10-day). By integrating seasonal hydrogen storage and pumped-storage hydroelectric plants, this framework achieves comprehensive coordination among electrochemical storage, thermal power, and other flexible resources. Second, a multi-time-horizon optimization model is developed to simultaneously minimize system operating costs and load curtailment costs. This model dynamically adjusts day-ahead scheduling boundary conditions based on long-term and short-term scheduling results, enabling cross-period resource complementarity during wind and photovoltaic generation troughs. Finally, comparative analysis on an enhanced IEEE 30-bus system demonstrates that compared to traditional day-ahead scheduling, this strategy significantly reduces renewable energy curtailment rates and load curtailment volumes during sustained low-generation periods, fully validating its significant advantages in enhancing power supply reliability and economic benefits.
Fields of Study & Subjects
Integrated Energy Systems Optimization
Electric Power System Optimization
Optimal Power Flow Distribution
Publication details
- Journal / source
- Energies
- Publisher
- MDPI AG
- Volume
- 19
- Issue
- 3
- Pages
- 721–721
- Publication date
- 29 January 2026
- Language
- EN