Study on the Characteristics and Parameter Optimization of Wedge Cut Delayed Blasting in a Tunnel

Read full text
Authors: Yu Hu, Renshu Yang, Jinjing Zuo, Wangjing Hu, Genzhong Wang, Yongli Guan, Baojin Jiang
Cited by: 2
References: 24

Abstract

To improve the blasting performance of tunnel wedge cutting while mitigating vibration effects, this study proposes a precise delayed blasting method and evaluates its effectiveness through a three-dimensional numerical simulation, similarity model test, and field application. The proposed method divides the cut holes into initial and secondary groups and uses electronic detonators to control the delay time. The numerical results show that delayed blasting reduces the peak stress in the surrounding rock, accelerates stress-wave attenuation, improves cavity integrity, and lowers the peak particle velocity (PPV), while maintaining sufficient rock breaking capacity. Model tests conducted under different delay times indicate that the delayed scheme increases the pull efficiency, decreases the ratio of large fragments, and reduces the PPV, with an optimal delay time range of 4~8 ms for moderately weathered limestone. Field tests in the Da Balai Tunnel further verify the effectiveness of the proposed method. Compared with conventional blasting, delayed blasting increases the pull efficiency from 77.8% to 97.3%, reduces the large fragment ratio from 30.6% to 11.4%, decreases the PPV by 52.5%, and increases the dominant vibration frequency by 48.7%. These results demonstrate that the proposed method can simultaneously enhance the rock-breaking quality and vibration control, providing practical guidance for tunnel blasting excavation under complex geological conditions.

Fields of Study & Subjects

Rock Mechanics and Modeling Tunneling and Rock Mechanics Drilling and Well Engineering

Publication details

Journal / source
Eng—Advances in Engineering
Publisher
MDPI AG
Volume
7
Issue
4
Pages
161–161
Publication date
1 April 2026
Language
EN