Progress on Developing a Sustainable BESS Technical–Economic Model by Mapping the Latest Grid-Connected Installations in Bulgaria

Read full text
Authors: Dimitrina Koeva, Metodi Dimitrov, Vladimir Zinoviev
Cited by: 2
References: 5

Abstract

The rapid construction and commissioning of battery energy storage system (BESS) installations, both standalone and combined with photovoltaic power plants (PVPPs), is rapidly reshaping the energy market. Mapping these latest iterations in the energy infrastructure allows for a detailed analysis of the effects they have on the grid, in correlation with the already abundant operational PPV. This paper will provide a list of all BESS installations commissioned between 1 January and 30 September 2025. Taking into consideration their grid-connection power, and respective battery capacity, along with their geographical location and co-located (or lack thereof) PVPPs, the following-up analysis aims to answer several key questions: how do these installations compare to one another in terms of power, capacity and distribution across Bulgaria; how do they affect the availability of electric power from PVPP, co-located or not, to the end consumers; and how does that shift in availability affect the profits, both for the BESS and PVPP owners, based on the shifting price of electricity?

Fields of Study & Subjects

Microgrid Control and Optimization Integrated Energy Systems Optimization Hybrid Renewable Energy Systems

Publication details

Journal / source
CIEES 2025
Publisher
MDPI
Pages
15–15
Publication date
16 January 2026
Language
EN