Numerical Simulation of Karst Groundwater Systems Under Construction of Xiushan Tunnel in Pingyanggai Syncline, Chongqing, China

Read full text
Authors: Xingyu Zhu, Qiang Xia, Mo Xu, Yinghe Wang, Yixiong Huang, Yayi Li, Boru Ding
Cited by: 0
References: 44

Abstract

Tunnel construction in karst aquifers can substantially alter groundwater flow systems. In this study, a three-dimensional groundwater flow model based on MODFLOW-CFP was developed to simulate the Pingyanggai synclinal karst system in Chongqing, China, incorporating dynamic tunnel excavation and lining processes. Under natural conditions, groundwater recharge is approximately 4.8 × 104 m3/d and is primarily balanced by discharge to the Yanmenkou and Miaolongtang underground rivers. Tunnel excavation introduced a new drainage outlet, generating an inflow of about 5.6 × 104 m3/d. The two underground rivers exhibited contrasting responses to excavation. Discharge from the Yanmenkou underground river decreased by approximately 6 × 103 m3/d (about 30%), indicating strong hydraulic connectivity with the tunnel, whereas the Miaolongtang underground river showed only minor changes. The simulated responses were qualitatively consistent with field observations during key excavation stages. These results demonstrate that tunnel excavation modifies not only the overall groundwater balance but also the internal redistribution of discharge pathways within the karst system, providing a quantitative basis for evaluating tunnel-induced hydrogeological impacts in complex karst environments.

Fields of Study & Subjects

Karst Systems and Hydrogeology Groundwater flow and contamination studies Groundwater and Isotope Geochemistry

Publication details

Journal / source
Hydrology
Volume
13
Issue
3
Pages
81–81
Publication date
4 March 2026
Language
EN