Study on Wellhead Pressure Control in the Cementing and Setting Stages Based on Pressure Transfer Efficiency

Read full text
Authors: Xiaoshan Wang, Qiang Cui, Zehao Zheng, Bin Yuan
Cited by: 0
References: 11

Abstract

This study addresses the challenge of annular gas migration control during the waiting-on-cement (WOC) period in managed pressure cementing for formations with narrow safe pressure windows. A dynamic pressure compensation optimization strategy is proposed by integrating a composite mechanistic model with experimental validation. Based on the hydration degree (T) model, a predictive model for static gel strength development was established. By coupling the gelation-induced suspension effect with cement slurry volumetric shrinkage, a static hydrostatic pressure decline model was developed. Experimental results indicate that the prediction errors of the proposed models are all within 7%, demonstrating improved accuracy compared with traditional empirical approaches and classical shear stress models. In addition, a testing methodology was developed to characterize pressure transmission efficiency during the WOC process, revealing its dynamic attenuation behavior. Experimental results show that when the static gel strength of anti-gas-migration cement slurry reaches 240 Pa, the pressure transmission efficiency ranges from 45% to 49%. Based on these findings, a wellhead backpressure calculation model incorporating the evolution of pressure transmission efficiency was established, providing a quantitative basis for annular pressure management during cement setting.

Fields of Study & Subjects

Drilling and Well Engineering Hydraulic Fracturing and Reservoir Analysis Hydrocarbon exploration and reservoir analysis

Publication details

Journal / source
Processes
Volume
14
Issue
3
Pages
538–538
Publication date
4 February 2026
Language
EN