Risk Assessment of Coal Mine Ventilation System Based on Fuzzy Polymorphic Bayes: A Case Study of H Coal Mine

Read full text
Authors: Jin Zhao, Juan Shi, Jinhui Yang
Cited by: 1
References: 47

Abstract

Coal mine ventilation systems face coupled and systemic risks characterized by structural interconnection and disaster chain propagation. In order to accurately quantify and evaluate this overall system risk, this study presents a new method of risk assessment of the coal mine ventilation system based on fuzzy polymorphic Bayesian networks. This method effectively addresses the shortcomings of traditional assessment approaches in the probabilistic quantification of risk. A Bayesian network with 44 nodes was established from five dimensions: ventilation power, ventilation network, ventilation facilities, human and management factors, and work environment. The risk states were divided into multiple states based on the As Low As Reasonably Practicable (ALARP) metric. The probabilities of evaluation-type root nodes were calculated using fuzzy evaluation, and the subjective bias was corrected by introducing a reliability coefficient. The concept of distance compensation is proposed to flexibly calculate the probabilities of quantitative-type root nodes. Through the verification of the ventilation system of H Coal Mine in Shanxi, China, it is concluded that the high risk of the ventilation system is 18%, and the high-risk probability of the ventilation system caused by the external air leakage of the mine is the largest. The evaluation results are consistent with real-world conditions. The results can provide a reference for improving the safety of the ventilation systems.

Fields of Study & Subjects

Risk and Safety Analysis Coal Properties and Utilization Underground infrastructure and sustainability

Publication details

Journal / source
Systems
Publisher
MDPI AG
Volume
14
Issue
1
Pages
99–99
Publication date
16 January 2026
Language
EN