Optimal Arrangement of Internal and External Walls of a Frame Building

Read full text Summarise with VIRAT
Authors: Irakli Kvaraia, Niko Eristavi
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

After the construction of building frames, the most lengthy and important process is the arrangement of its enclosing and internal walls, as well as partitions and communication shafts. The start of the cladding stage and the timely completion of the entire construction depend mainly on the completion of these works. Although in the vast majority of frame buildings, both internal and external enclosing walls are non-load-bearing structures, their construction is still quite laborious. For example, when arranging external enclosing walls with suspended panels, in addition to the lifting equipment, it is necessary to perform welding work and fill the seams between the panels with cement-sand or other types of grout. With thin wall materials (blocks, bricks, etc.), it is necessary to use grout, arrange insulating layers, plaster their surfaces using various types of materials, etc. In recent years, gypsumcardboard systems have been used as a rule when arranging internal walls and partitions of a building, which significantly speeds up the work and simplifies the entire process. It is precisely because of their advantages that examples of arranging gypsum-cardboard systems in external enclosing walls are increasingly common. One of the first cases was carried out several years ago in Tbilisi, during the construction of “m2” buildings.

Fields of Study & Subjects

Building energy efficiency and sustainability Civil and Structural Engineering Research Construction Engineering and Safety

Publication details

Journal / source
Works of Georgian Technical University
Issue
1(539)
Pages
67–73
Publication date
25 March 2026
Language
EN