ANALYSIS OF THE CONSTRUCTION OF STATIONARY OFFSHORE JACK-UP RIG NO. 50 FOR DRILLING 16 PRODUCTION WELLS AT THE ABSHERONNEFT OIL AND GAS PRODUCTION DEPARTMENT

Read full text Summarise with VIRAT
Authors: Səbuhi Əhmədov Səbuhi Əhmədov, Möhsüm Kazımov Möhsüm Kazımov
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

The article presents a comprehensive technical and economic analysis of the construction of the stationary offshore jack-up rig No. 50 for drilling 16 production wells in the oil and gas fields of the Absheronneft Oil and Gas Production Department. Taking into account the complex geological and technological conditions of the oil and gas fields on the Caspian shelf of Azerbaijan, the issues of compliance of the construction process of the stationary offshore jack-up rig with modern engineering requirements, calculation of structural elements and design of the necessary technological infrastructure for drilling production wells were examined in detail. Within the framework of the study, the main structural parameters of the stationary offshore jack-up rig-the jack-up mechanism, the load-bearing capacity of the working platform, the anchor system and the wellhead placement scheme-were analyzed. Also, the materials, welding technologies, penetration testing methods and measures for compliance with international offshore standards applied at various stages of the construction of the stationary offshore jack-up rig No. 50 were considered. The article also extensively discusses the issues of adapting the rig to the hydrological characteristics of the Caspian Sea-water depth, wave height, and wind impact. The concluding part of the article substantiates the technical problems encountered during the construction of a stationary offshore jack-up rig, their solutions, as well as optimal technological decisions ensuring the implementation of the drilling program for 16 wells of strategic importance. Keywords: stationary offshore self-propelled jackup rig, "Absheronneft" Oil and Gas Company, production well, offshore drilling, Caspian shelf, oil and gas production, construction project, technological infrastructure.

Fields of Study & Subjects

Offshore Engineering and Technologies Drilling and Well Engineering Marine and Offshore Engineering Studies

Publication details

Journal / source
ETM Equipment Technologies Materials
Pages
84–84
Publication date
19 March 2026
Language
EN