MEASURES TO PREVENT SAND PRODUCTION OCCURRING DURING THE WELL PRODUCTION PROCESS. THE IMPORTANCE OF WATER BEARING LAYERS IN THE REDUCTION OF OIL PRODUCTION, ISOLATION OF WATER BEARING LAYERS

Read full text Summarise with VIRAT
Authors: Zaming Ismayilov Zaming Ismayilov, Khanlar Sardarov Khanlar Sardarov
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

Sand production during well operation remains a pervasive technical and economic challenge in unconsolidated and weakly consolidated reservoirs. This study presents a practical decision framework that links formation diagnosis, risk ranking, pilot validation, and adaptive monitoring to the selection and sequencing of sand control measures. Methods evaluated include mechanical containment (gravel pack, frac pack, slotted and wire wrapped screens, expandable screens), chemical consolidation (resin and polymer squeeze treatments), and zonal water shutoff techniques (polymer gels, relative permeability modifiers, mechanical plugs). The paper describes criteria for matching interventions to reservoir attributes such as grain size distribution, sorting, permeability, porosity, in situ stress state, and expected drawdown. Comparative analysis synthesizes field evidence and engineering reasoning to assess effectiveness, placement reliability, impact on deliverability, and lifecycle cost. Results indicate that single method deployments often fail in heterogeneous settings, whereas targeted hybrid sequences—localized chemical stabilization of the weakest micro-zones followed by a gravel pack—reduce sand influx, protect completion hardware, and sustain oil rates. The study also demonstrates that addressing water bearing layers through zonal isolation reduces hydrodynamic drivers of fines migration and improves overall intervention durability. Practical guidance includes candidate well selection, pilot design, monitoring metrics, and trigger thresholds for remediation. The conclusion recommends a site specific, pilot driven approach that balances technical performance, economic return, and environmental stewardship to minimize sand production and preserve reservoir value. Implementation should include documented lessons learned, iterative optimization, transparent reporting to stakeholders and regulators, and continuous improvement process. Keywords: sand production; sand control; gravel pack; chemical consolidation; water shutoff; zonal isolation; fines migration; wellbore stability.

Fields of Study & Subjects

Drilling and Well Engineering Hydrocarbon exploration and reservoir analysis Hydraulic Fracturing and Reservoir Analysis

Publication details

Journal / source
ETM Equipment Technologies Materials
Pages
92–92
Publication date
19 March 2026
Language
EN