高层建筑逆作法施工技术应用与优化
Summary
No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.
Summarise with VIRAT Free to try with your Science Catalogs account.Abstract
高层建筑逆作法施工技术通过自上而下施工顺序,实现地下与地上工程同步作业,有效缩短工期、减少 围护结构变形。其核心在于地下连续墙与中间支承柱形成的临时承重体系,结合分层开挖、盆式支护及信息化监测, 控制基坑变形。优化方向包括“两墙合一”技术减少材料浪费、装配式预制构件提升施工效率,以及智能监测系统实 现动态风险预警,提升施工安全性与经济性。
Fields of Study & Subjects
Civil and Geotechnical Engineering Research
Geotechnical Engineering and Analysis
Civil and Structural Engineering Research
Publication details
- Journal / source
- 现代工程项目管理
- Volume
- 5
- Issue
- 1
- Pages
- 142–144
- Publication date
- 1 January 2026
- Language
- ZH