Design and Analysis of a Stand-alone 5G Private Network for Rheinhafen-Dampfkraftwerk Karlsruhe Power Generation Plant
Summary
No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.
Summarise with VIRAT Free to try with your Science Catalogs account.Abstract
This paper presents the design and technical analysis of a private 5G network for Rheinhafen- Dampfkraftwerk Karlsruhe power plant, integrating mid-band (N78, 3.6 GHz) and millimeter-wave (26.5 GHz) frequencies in a Stand-alone Non-Public Network (SNPN) architecture. We evaluate backhauling options, link budget, bandwidth allocation, and radio dimensioning to guarantee reliable low-latency communications for critical industrial applications including SCADA, IoT sensors, and 4K video monitoring. Capacity analysis estimates peak traffic exceeding 1 Gbps, addressed through one N78 macro node for wide-area coverage and four 26.5 GHz micro nodes for high-density areas. Operational costs are compared using TU Dortmund Campusnetzplaner tool. The proposed configuration demonstrates technical feasibility and scalability for industrial private 5G networks, ensuring high reliability and readiness for future digitalization in power generation facilities.
Fields of Study & Subjects
Millimeter-Wave Propagation and Modeling
Telecommunications and Broadcasting Technologies
Advanced Data and IoT Technologies
Publication details
- Journal / source
- WSEAS Transactions on Circuits and Systems archive
- Volume
- 25
- Pages
- 10–10
- Publication date
- 30 March 2026
- Language
- EN