Implementasi Sistem Kendali Otomatis Untuk Meningkatkan Efisiensi Injeksi Gas Pada Sumur Gas Lift X di Perusahaan Migas

Read full text Summarise with VIRAT
Authors: Sony Santoso, Siti Rahayu, Dodit Arditama
Cited by: 0
References: 14

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

An oil and gas company is currently experiencing a problem where there has been a waste of material in the form of gas lift that should be able to lift production optimally. Unstable gas injection can cause production losses. This study aims to implement an automatic control system, called "Auto Kick Off," to improve gas injection efficiency at Gas Lift Well X, District B, Indonesia. This study uses the PDCA (Plan-Do-Check-Act) approach to systematically identify problems, implement improvements, and evaluate their impact on operational performance, safety, and profitability. Data collection was carried out through documentation and direct observation of the operational process, followed by analysis using the PDCA framework. After implementation, the system successfully maintained a stable gas injection pressure of 650 Psi, and created stable production output. Financial analysis projects a substantial increase in profits of Rp 553 million/month. The user satisfaction rate is high at an average of 80% and the system demonstrates strong quality assurance. The research results concluded that the automated control system was highly effective in optimizing gas injection, minimizing waste, and improving operational efficiency and overall safety. Its successful implementation at the Gas Lift X Well provides a strong basis for reference at other facilities.

Fields of Study & Subjects

Oil and Gas Production Techniques Industrial Automation and Control Systems Management and Optimization Techniques

Publication details

Journal / source
Jurnal KaLIBRASI - Karya Lintas Ilmu Bidang Rekayasa Arsitektur Sipil Industri
Volume
9
Issue
1
Pages
119–127
Publication date
26 March 2026
Language
EN