Prospects for robotization of the process during the modernization of barge platforms of the R-56 project to increase the RCS sailing category (class)

Read full text Summarise with VIRAT
Authors: Павел Бимбереков
Cited by: 0
References: 1

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

When upgrading vessels to upgrade their operational class, it is necessary to ensure that their hull structure requirements meet current standards at the time the modernization project is developed. The feasibility of designing and implementing modernization work, rather than designing and building a new vessel, is determined by the following: the level and scope of design work; production requirements (material resources and personnel); and the volume of rolled metal products to be replaced and introduced. To maintain the ability to perform loading and unloading operations using a grab in accordance with current standards, the wall thickness of the below-deck frame girders and the bulkhead chords adjacent to the deck must be significantly greater than the residual thickness of these structures on the Project R-56 platform barges being modernized. Their complete replacement using accepted technologies was deemed impractical, practically resulting in the abandonment of the modernization of the deck flooring, which has accumulated residual deformations. To modernize the aforementioned deck and bulkhead connections, a series of works were carried out at SKS 013.R-56 Shipping Company LLC (SK Sever) under the supervision of the author of the project to justify the installation of reinforcing elements in the form of overlay plates. The Russian River Register (now the Russian Classification Society) accepted the proposed justification for the applicability of this technical solution and approved the modernization project. Patent No. 2448861 was later issued for this unconventional technical solution. The obvious goal of the technical solution is to minimize metal and labor costs during the modernization of the deck floors of Project R-56 barges, allowing the work to be carried out by SK Sever itself. Potential robotization of this modernization process and the possibility of replacing the underdeck frame beams and bulkhead chords piece by piece with a robotic system are being discussed.

Fields of Study & Subjects

Marine and Coastal Research Engineering Diagnostics and Reliability Structural Integrity and Reliability Analysis

Publication details

Journal / source
Russian Journal of Water Transport
Issue
86
Pages
13–21
Publication date
23 March 2026
Language
EN