Construction Contract Administration Performance Modelling towards a Sustainable and Efficient Project Delivery

Read full text
Authors: O. O. Odumosu, Bamitale Dorcas Oluyemi-Ayibiowu, K. E. Falola, H. Babalola
Cited by: 0
References: 5

Abstract

Poor construction administration performance is a significant cause of inefficient construction process which is a major problem for construction projects in Nigeria. This research developed a model to appraise the contract administration performance of construction project. A total of ninety-three (93) construction administration process grouped into eleven (11) phases were rated by expert respondents in a questionnaire survey. A Structural equation model between the construction contract administration performance (CCAP) and the eleven (11) Construction Contract Administration (CCA) phases which include the governance and start-up management (GS), team management (TM), communication and relationship management (CR), document and record management (DRM), claims and dispute resolution management (CDM), performance monitoring and reporting development (PR), financial management (FM), quality and acceptance management (QA), changes and change control management (CM), contract risk management (CR) and contractor close out management (CCM) were developed. From the resulting model generated, PR, QA and GS had the highest influence on CCAP with model coefficients of 0.977, 0.962 and 0.954 respectively, while the least influential is CR with coefficients of 0.744. This further enunciates the importance of monitoring to the overall success of all contractual obligations of a construction project.

Fields of Study & Subjects

Construction Project Management and Performance Value Engineering and Management BIM and Construction Integration

Publication details

Journal / source
Engineering headway
Volume
33
Pages
339–346
Publication date
12 February 2026
Language
EN