Standard form contracts: (III) The BIMCO “Supplytime 2017” form (together with its predecessor “Supplytime 2005”; the “Windtime” and the “ASVtime” variants)

View at publisher Summarise with VIRAT
Authors: Simon Rainey
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

This chapter contains a clause-by-clause commentary on the leading standard form contract for offshore services, the BIMCO “Supplytime 2017” form, with an analysis of the differences between the 2017 form and the 2005 form, which is still in frequent use. In addition consideration is given to “sister” forms which are heavily based on the “Supplytime” model, namely the “Windtime” form designed for offshore wind farm personnel transfer and support vessel services and the new BIMCO “ASVtime” of 2021, designed for the time chartering of specialised offshore accommodation vessels or “floatels.”

Fields of Study & Subjects

Law logistics and international trade Legal principles and applications Marine and Offshore Engineering Studies

Publication details

Pages
273–418
Publication date
23 March 2026
Language
EN
Document type
Book chapter