Application of Graphical Evaluation and Review Technique to Determine Product Completion Time in Manufacturing Process

Read full text
Authors: Institut Teknologi Nasional, Bandung, Indonesia, Lisye Fitria, Andika Pramudya, Institut Teknologi Nasional, Bandung, Indonesia, Yanti Helyanti, Institut Teknologi Nasional, Bandung, Indonesia, Yuniar, Institut Teknologi Nasional, Bandung, Indonesia
Cited by: 0

Abstract

The discrepancy between actual production process time and standard time is often occurs, because the calculation of production time does not take int account the repair time caused by defective products. The Graphical Evaluation and Review Technique (GERT) method is used to determine the production process time by considering repair time due to defective product. GERT is used to calculate the average and variance of the production time in stochastic work network and put into consideration the possibility of rework so that the completion time is close to the actual condition. The calculation results show a difference between the standard production time of the front spar component of 3,841.69 minutes/unit and the rear spar of 4,080.81 minutes/unit, while based on the GERT method the production time of the front spar is 4,657.77 minutes/unit and the rear spar is 4,406.01 minutes/unit.

Fields of Study & Subjects

Resource-Constrained Project Scheduling Management and Optimization Techniques Manufacturing Process and Optimization

Publication details

Journal / source
INTERNATIONAL JOURNAL OF MULTIDISCIPLINARY RESEARCH AND ANALYSIS
Volume
09
Issue
01
Publication date
30 January 2026