Reliability of stochastic capacity estimates

Read full text
Authors: Igor Mikolášek
Cited by: 0

Abstract

Stochastic traffic capacity is used in traffic modelling and control for unidirectional sections of road infrastructure, although some of the estimation methods have recently proved flawed. However, even sound estimation methods require sufficient data. Because breakdowns are rare, the number of recorded breakdowns effectively determines sample size. This is especially relevant for temporary traffic infrastructure, but also for permanent bottlenecks (e.g., on- and off-ramps), where practitioners must know when estimates are reliable enough for control or design decisions. This paper studies this reliability along with the impact of censored data using synthetic data with a known capacity distribution. A corrected maximum-likelihood estimator is applied to varied samples. In total, 360 artificial measurements are created and used to estimate the capacity distribution, and the deviation from the pre-defined distribution is then quantified. Results indicate that at least 50 recorded breakdowns are necessary; 100-200 are the recommended minimum for temporary measurements. Beyond this, further improvements are marginal, with the expected average relative error below 5 %.

Fields of Study & Subjects

Traffic control and management Traffic Prediction and Management Techniques Transportation Planning and Optimization

Publication details

Journal / source
arXiv (Cornell University)
Publication date
22 February 2026
Language
EN
Document type
Preprint