Wholistic Integrity Management Approach to Temporarily Convert NG Pipelines into Water Service

View at publisher Summarise with VIRAT
Authors: Elliot Speight, Nicki Robertson
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

Abstract Converting natural gas and emulsion pipelines into water service presents many unique challenges which require a comprehensive integrity plan (IP) to effectively mitigate risk. This methodology outlines the successful implementation of a wholistic, project specific IP to support the temporary conversion of a small diameter natural gas and oil emulsion pipeline system into water service for a six-month period. The implemented IP proved effective in reducing operational risk and pipeline degradation, which is demonstrated in in-line inspection (ILI) results following the conversion. Lessons learned from this project highlight the importance of a proactive and systematic approach to pipeline integrity management when repurposing existing infrastructure for alternate operation. This case study provides a framework for safely completing temporary service changes based on appropriate threat identification for proactive integrity management to effectively minimize risk to both the pipeline and the environment.

Fields of Study & Subjects

Structural Integrity and Reliability Analysis Material Properties and Failure Mechanisms Engineering Diagnostics and Reliability

Publication details

Journal / source
AMPP Alberta Conference
Pages
1–8
Publication date
9 February 2026
Language
EN