GENERAL OVERVIEW AFTER IMPLEMENTED FMEA METHODOLOGY INTO INDUSTRIAL CAPACITY FROM NORTH MACEDONIA

Read full text
Authors: Ivo Kuzmanov, Roberto Pasic
Cited by: 0

Abstract

The basic aim of the paper is to present only a small part from an extensive research conducted into industrial entity from R. North Macedonia, done into the period November 2016 – January 2025. The frst step of implementing was done into the period November 2016 – January 2018 till fully implemented.The industrial capacity which was taken into consideration was from the metalworking industry and the same one was till 2019 with a serious capacity and serious productivity of stoves and fireplaces on solid fuel. Since the COVID started and it was problem to get row materials the capacity has significantly reduced the numbers of fully produced pieces and problems started. It was an entity with more than 300 employees and a production which is saled in the Balcans till 2019, but since COVID crises, raw material purchase.

Fields of Study & Subjects

Management and Optimization Techniques Management Systems and Quality Improvement Quality and Management Systems

Publication details

Journal / source
TEMEL Citizens Association Center for Development Organization Research Promotion of Values Education and Promotion of Youth
Volume
10
Issue
1
Pages
39–39
Publication date
1 February 2026
Language
EN