Probabilistic Management of Uncertainty in Innovative Construction Projects

Read full text
Authors: Bertold Urbano, Armando Orobio
Cited by: 0

Abstract

This extended conference abstract evaluates the limitations of traditional deterministic planning methods like CPM compared to probabilistic approaches for managing uncertainty in construction projects. Through a comparative analysis of a rural house built using conventional methods versus 3D printing technology, the study utilizes a three-phase methodology incorporating CPM scheduling and Monte Carlo simulations to model schedule risks. The results demonstrate that while 3D printing offers shorter estimated durations, it exhibits significantly higher variability due to its innovative nature, leading the authors to conclude that integrating probabilistic modeling provides a superior framework for anticipating deviations and managing the inherent uncertainty of emerging construction technologies. +4

Fields of Study & Subjects

Construction Project Management and Performance BIM and Construction Integration Resource-Constrained Project Scheduling

Publication details

Journal / source
Zenodo (CERN European Organization for Nuclear Research)
Publication date
6 February 2026
Language
EN