Study of the operation and performance of the Hamdallaye electrical substation in Conakry, Guinea

Read full text Summarise with VIRAT
Authors: Ansoumane Sakouvogui, Madeleine HABA, Elhadj Ousmane Camara, Dr Jean Ouèrè TOUPOUVOGUI, Ibrahima Maciré CAMARA, Séckou Bodian
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

The Guinean electricity grid is constantly overloaded due to the rapidly evolving energy needs ofhouseholds and businesses. This study, which contributes to grid security, focuses on the operation andperformance of the Hamdallaye electrical substation in Conakry. Its overall objective is to monitor the substation'soperation to optimize its efficiency (reducing the voltage from 60 kV to 20 kV and improving distribution). Thesubstation's operating parameters (frequency, incoming and outgoing voltages, current, active and reactive power)were monitored for one year (2022), as well as the electrical power supplied to the neighborhoods.Taouyah,Crusher, Commandanyah and Hafia.It appears that: the frequency changes from (50.043 Hz) innovemberhas(50.382 Hz) in February, with an annual average of (50.248 Hz);the incoming voltage varied by (58.638 kV) inApril at (60.672 kV) in August, with an annual average of (59.523 kV); the starting voltage varied from (20.228kV) in August to (22.011 kV) in April with an annual average of (20.971 kV); The current has varied from (130.901A) in August at (204.251 A) in April, with an annual average of (172.16 A);the active power varied from (12.329MW) in August at (26.604 MW) in April, with an annual average of 17.005 MW; thereactive power varied from(4.577 MVAr) inOctoberhas(7.630 MVAr) in April with an annual average of 6.072 MVAr. The average annualelectrical power distributed per district is: Taouyah (65.881 MW), Crusher (65.656 MW), Commandanyah (40.132MW), and Hafia (26.294 MW). During 2022, the average peak consumption of the four districts was 20.088 MWin April, with an annual average of 16.497 MW. Taking into account the development of offenders and populationgrowth, we suggest thatthe power transformer (25 MW) of the substation is one of (35 to 50 MW).

Fields of Study & Subjects

Power Quality and Harmonics High-Voltage Power Transmission Systems Smart Grid and Power Systems

Publication details

Journal / source
Zenodo (CERN European Organization for Nuclear Research)
Publication date
1 January 2026
Language
EN