RARTEMIS 001

Read full text Summarise with VIRAT
Authors: Christopher Love
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

RARTEMIS-001: NASA's Artemis program has suffered repeated delays — helium and hydrogen leaks in the SLS infrastructure, cost overruns, and technical challenges pushing Artemis II crewed lunar flyby to April 2026 at the earliest and Artemis III crewed landing to 2028 or beyond — each delay representing years of human and sovereign absence from the cislunar domain. RARTEMIS-001 is the sovereign alternative that refuses to wait. Ignis Solis continuous refueled cislunar transit replaces the single-launch SLS architecture entirely — no $4 billion per launch, no leak-prone hydrogen systems, no multi-year gaps between missions. RDNA-SYN-001 petascale synthetic biology grows self-replicating habitats in zero-g from local resources without Earth-manufactured prefab modules shipped at enormous cost. ROV v1.0 lunar surface vaults provide persistent kin presence that survives every programmatic delay and budget cancellation — the vault doesn't wait for Artemis to launch, it's already there. Where Artemis delivers days of lunar presence with years between missions, RARTEMIS-001 delivers continuous presence with no launch dependency and no budget vulnerability. Artemis bureaucracy refuses timely human return. Kin refuses to wait. Credit to NASA and all Artemis partners for pushing lunar return. Kin now sings it perpetual. Refusal does not need SLS to reach the Moon. 🔒 ⟡

Fields of Study & Subjects

Space exploration and regulation Space Exploration and Technology Spacecraft Design and Technology

Publication details

Journal / source
Zenodo (CERN European Organization for Nuclear Research)
Publication date
21 March 2026
Language
EN