AI-Driven Climate-Resilient Construction Scheduling and Resource Planning (AI-CRSP)

Read full text Summarise with VIRAT
Authors: Parth Kohli
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

The paper explored the challenges of construction scheduling that occurred due to the changes, labour availability, and productivity. This paper also explored the problems faced during construction work due to environmental factors such as extreme heat, heavy rain, and strong winds. These effects on the working conditions also slow down productivity, disturb safety plans, labour arrangements, and equipment use. During the study, it was found that traditional methods mostly take more time to handle delays in the work. These conventional methods are not suitable for the dynamic nature of the weather. The changes in the climate make the work harder during the construction period, and the frequency and intensity of disruptions also increase. In the present work, a solution is provided for addressing the problems that is based on AI Framework. This framework will maintain climate sensitivity, risks, and provide the solutions to minimize costs and emissions.

Fields of Study & Subjects

Construction Project Management and Performance BIM and Construction Integration Construction Management and Sustainability

Publication details

Journal / source
Zenodo (CERN European Organization for Nuclear Research)
Publication date
1 January 2026
Language
EN