Execution Governance for NetZero

Read full text Summarise with VIRAT
Authors: Ho Wa Ku
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

Execution Governance for NetZero v2.0.8 presents a cumulative domain research architecture for governing consequential climate-infrastructure effects at the point where a proposed action becomes externally effective. The paper addresses a distinct governance question: even when an optimizer, AI system, controller, market process, or software service can produce a technically valid action, does the exact proposed effect still possess current authority to be committed under the live conditions that apply at that moment? The architecture applies the cumulative Execution Governance research stack rather than treating successive EG layers as replacements. It retains the Six Conditions as the normative base and specializes: EG3 — Commitment Integrity: binding authorization to the exact effect being released; EG4 — Fabric Integrity: preserving current, non-expanding and revocable authority across heterogeneous execution chains; EG5 — Regime Integrity (candidate research layer): governing material changes to the rules, authority roots, methods and reconciliation structures that shape future effects; and EG6 — Grounding Integrity (candidate research layer): binding effect-dispositive claims to the correct referent, property, procedure, semantics, time and uncertainty at commitment. The paper explicitly separates normative authorization, enforcement realization, assurance/evidence, and independent safety/protection. A valid signature, trusted sensor, carbon-accounting method, registry record, safety monitor or successful model output may provide evidence or constraints, but none independently creates execution authority. A bounded Minimal Governed Dispatch Profile (MGDP-NZ v0.1) provides machine-readable objects, JSON Schema, counterexample vectors, a public research reference API and a reproducibility framework. The frozen v0.1.2 endpoint release has reproduced all 41 declared release tests and the full nominal synthetic authorization-to-reconstruction episode on a materially separate, author-controlled same-operator VM. Under the evidence-gate framework defined in the paper, G0 Definition/Fact-Check, G1 Executable Profile, G3 Synthetic Multi-Component and G4 Public Reproducibility are achieved within the declared bounded research scope. G2 Formal Candidate, G5 organizationally independent reconstruction, G6 bounded CPS/HIL and G7 supervised pilot remain open. G4 therefore does not constitute third-party independent reconstruction. The work is an independent research and pre-standardization architecture. It does not claim grid-safety certification, carbon-accounting assurance, regulatory compliance, production readiness, universal portability, or replacement of domain standards such as NERC reliability standards, EU network codes, GHG Protocol, ISO 14064, CBAM, ESRS, Verra or Gold Standard. Canonical research endpoint:https://schema.executiongovernance.org/netzero/v0.1 Research programme:https://executiongovernance.org Core proposition:Ability is not authority. Climate evidence is not authority. Safety evidence is not authority.

Fields of Study & Subjects

Access Control and Trust Sustainability and Climate Change Governance Climate Change and Geoengineering

Publication details

Journal / source
Zenodo (CERN European Organization for Nuclear Research)
Publication date
29 March 2026
Language
EN