APR-Lite Phases 10.0–10.3 — Sector Escalation, Retention Windows, Peer Grants, and Cross-Tenant Read Enforcement
Summary
No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.
Summarise with VIRAT Free to try with your Science Catalogs account.Abstract
This note records the completion of four phases that transformed the APR-Lite substrate from a set of governance surfaces into a coherent constitutional machine. Phase 10.0 activated sector-level freeze escalation. Phase 10.1 introduced temporal retention windows. Phase 10.2 completed the bilateral peer grant lifecycle. Phase 10.3 wired every governance primitive into the cross-tenant read path. As of Phase 10.3, every cross-tenant read is a fully governed operation.
Fields of Study & Subjects
Access Control and Trust
Blockchain Technology Applications and Security
Distributed systems and fault tolerance
Publication details
- Journal / source
- Zenodo (CERN European Organization for Nuclear Research)
- Publication date
- 28 March 2026
- Language
- EN