Fourth Dynasty Constraint Engine: A Throughput Model for Ancient Construction Programmes
Summary
No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.
Summarise with VIRAT Free to try with your Science Catalogs account.Abstract
A browser-based interactive tool for modelling throughput constraints in the Fourth Dynasty Egyptian pyramid-building programme (c. 2610-2510 BCE). Evaluates whether orthodox capacity estimates can deliver six major pyramids within attested timelines using the Theory of Constraints. Includes non-linear demand profiles normalised per structure and material stream, seasonal workforce modelling, four-way labour allocation, per-stream dressing for core limestone, Tura casing, and Aswan granite, sensitivity analysis, reverse solving, and the Choi/Lee cannibalisation hypothesis. Ships with a dependency-free regression harness that verifies the model against a recorded fixture set.
Fields of Study & Subjects
Operations Management Techniques
Ancient Egypt and Archaeology
Historical and Architectural Studies
Publication details
- Journal / source
- Zenodo (CERN European Organization for Nuclear Research)
- Publication date
- 30 March 2026
- Language
- EN