Efektivitas Kontrak Lump Sum pada Proyek Konstruksi di Kabupaten Kutai Barat

Read full text
Authors: Sopiani Sopiani, Findia Findia, Habir Habir
Cited by: 0

Abstract

Lump sum contracts are widely used in Indonesian construction, yet questions persist about which factors—cost effectiveness, schedule effectiveness, or risk management—most significantly influence work quality and contractor satisfaction. This research addresses two critical questions: (1) what factors affect lump sum contract effectiveness based on project performance, and (2) which of the three variables most significantly impact work quality and contractor satisfaction in West Kutai District projects. The study employed quantitative methods with 30 contractor respondents, collecting data through structured 5-point Likert scale questionnaires. Validity was tested using Pearson correlation analysis and reliability assessed via Cronbach's Alpha. Multiple linear regression examined the influence of the three independent variables on work quality and contractor satisfaction. Results indicate that cost effectiveness significantly affects contractor satisfaction (β = 0.337; t = 2.097; p = 0.046), while schedule effectiveness and risk management show no significant effects on either dependent variable. The regression models explain only 41.6% of contractor satisfaction variance and 22.4% of work quality variance, indicating substantial unexplained factors. These findings demonstrate that among examined variables, cost effectiveness is the primary determinant of contractor satisfaction in lump sum contracts. However, the incomplete variance explanation emphasizes that identifying additional factors influencing contract effectiveness is essential for improving construction project outcomes in regional contexts

Fields of Study & Subjects

Construction Project Management and Performance Public-Private Partnership Projects Value Engineering and Management

Publication details

Journal / source
SENTRI Jurnal Riset Ilmiah
Volume
5
Issue
1
Pages
480–490
Publication date
30 January 2026
Language
EN