Analisis Perencanaan Waktu Pada Proyek Peningkatan Ruas Jalan Bulo-Bungin Di Kabupaten Enrekang
Abstract
This study examines the "Review of Time and Labor Schedule Planning for the Bulo-Bungin Road Improvement Project in Enrekang Regency" which has the aim of knowing the duration of time and how much optimal labor is needed or required in the Bulo-Bungin road improvement project in Enrekang Regency. This research uses quantitative research to analyze data obtained from project sites and related documentation. The analysis method used in this research is Critical Path Method (CPM). Where Critical Path Method (CPM) is used to prioritize project activities or activities. The results showed that using the Critical Path Method to plan the project's time and labor schedule was more effective, because the duration of the work time was 8 days faster than before using the s-curve says it takes 140 days.
Fields of Study & Subjects
Resource-Constrained Project Scheduling
Construction Project Management and Performance
Civil and Structural Engineering Research
Publication details
- Journal / source
- Jurnal Penelitian Teknik Sipil Konsolidasi
- Volume
- 4
- Issue
- 1
- Pages
- 70–78
- Publication date
- 30 January 2026
- Language
- EN