Using R. Belbin’s Model for Designing Project Teams

Read full text Summarise with VIRAT
Authors: Sergey D. BUSHUYEV, Dmytro Lukianov, Kateryna Kolesnikovca, Ardak Mukhamediyeva
Cited by: 0
References: 9

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

The article delves into the potential application of the Belbin test in the context of “quick diagnostics” for project teams. This innovative approach examines how R. Belbin’s team role models can be harmonized with the individual competencies outlined by the International Project Management Association (IPMA) for project managers, known as ICB (Individual Competence Baseline). The focus is on integrating these two frameworks to enhance the efficiency and effectiveness of team diagnostics. To achieve this, the article proposes using a matrix developed through a detailed analysis of the correspondences between the elements of R. Belbin’s team roles and the competencies specified in IPMA ICB4.0. This matrix is a primary analytical tool, systematically evaluating team dynamics and individual contributions within project management. Additionally, the article explores an approach to modeling a possible profile of a project manager using the ‘dimensions’ of the Belbin model. This modeling technique, with its strategic value, enables a more nuanced portrayal of a project manager’s capabilities, providing insights into how they might perform in various team roles and settings. This approach not only aids in quick diagnostics but also in the strategic development of project teams, inspiring you with the potential to create high-performing teams that meet project goals effectively.

Fields of Study & Subjects

Team Dynamics and Performance Construction Project Management and Performance Competency Development and Evaluation

Publication details

Journal / source
International Conference on Organization, Technology and Management in Construction (OTMC)
Pages
34–47
Publication date
28 March 2026
Language
EN