Monte Carlo Simulation-Based Framework Schedule Creation
Summary
No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.
Summarise with VIRAT Free to try with your Science Catalogs account.Abstract
An investor developer decides whether to invest in a real estate project on the basis of an investment project study. The main challenge of an investment project study is that it is prepared at an early stage of the project, when a lot of the information is incomplete and subject to uncertainty. The feasibility and profitability of a project are significantly influenced by the project schedule, which is regularly presented in the form of a framework schedule of the project. Framework schedules are generally based on deterministic input data. However, due to the individuality of each real estate project development, this input data, which is typically taken from literature or internal company databases, is only of very limited value as it does not consider the project’s individual risk profile. In order to obtain a realistic forecast of the framework schedule and thus a more reliable basis for the subsequent profitability analysis, time risks, which are also dependent on the type of project award, should be adequately considered. In this paper a model is presented that focuses on the calculation of scheduling with consideration of time risks and which was developed as a tool for auditing office real estate assets. For the consideration of time risks and time bandwidths when calculating the task durations of a framework schedule, the Monte Carlo simulation was integrated. This allows a project-specific risk assessment when calculating the framework schedule as well as the creation of various framework schedule scenarios. By selecting one (probability of occurrence) of a Monte Carlo simulation-based schedule, the profitability of the concomitant project implementation is calculated in the integrated financial model. Furthermore, the impact of scheduling on profitability is shown. Finally, the comparison of the created scheduling scenarios with the associated economic analyses can support an investment decision and the derivation of the rough time structure of the project. The procedure, respectively the integrated financial model, which aims to increase resilience to disruptions and interruptions during the development and construction phase, will be illustrated using an example.
Fields of Study & Subjects
Capital Investment and Risk Analysis
Construction Project Management and Performance
Real estate and construction management
Publication details
- Journal / source
- International Conference on Organization, Technology and Management in Construction (OTMC)
- Pages
- 63–85
- Publication date
- 28 March 2026
- Language
- EN