Project Management Information System Tools and Performance of Mechanical Building Services in Construction Projects in Kiambu County, Kenya

Read full text Summarise with VIRAT
Authors: Paul Kamau Ndiritu, Maurice Owino Pedo
Cited by: 0
References: 24

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

This research is purposed to establish the influence of PMIS tools to the performance of mechanical building services in construction projects in Kiambu County in Kenya. The major cause of failure in building construction projects is lack of adoption of technology among those involved in Mechanical Building Services in construction. Developing countries have a high rate of lower project performance compared to developed countries. Project Management Information Systems (PMIS) tools are integral tools for efficient planning, execution, and monitoring of Mechanical building services in construction projects globally. However, despite their widespread adoption, the extent to which PMIS tools contribute to the overall performance of building construction projects is unclear. The study seeks to examine the influence of project management information system tools on performance of Mechanical Building Services in construction projects in Kiambu County, Kenya. The specific objectives that the study seeks to achieve are to examine the influence of quality of PMIS tools, PMIS tools information output status, utilization level of PMIS tools and PMIS tools software ability on the performance of Mechanical building services in construction projects in Kiambu County, Kenya. The study has adopted three theories; Theory of Constraints, Resource Based Theory and Systems Theory. The study has developed a conceptual framework to show the relationship between Project Information Management System tools and performance of Mechanical building services in construction projects in Kenya. The study will adopt a descriptive research design. The target population for the study will be engineers, architects, contractors and project managers. The data collection instrument will be a semi-structured questionnaire. A pilot study will be conducted to verify the validity and reliability of the data collection tools before actual data collection. Data analysis will be carried out using descriptive statistics and inferential statistics. Presentation of data will be in form of charts and tables as it will be deemed appropriate

Fields of Study & Subjects

Construction Project Management and Performance BIM and Construction Integration Construction Management and Sustainability

Publication details

Journal / source
European journal of management, economics and business.
Volume
3
Issue
2
Pages
174–183
Publication date
17 March 2026
Language
EN