THE IMPLEMENTATION OF PROJECT MANAGEMENT SCHEDULING USING CRITICAL PATH METHOD (CPM) AND PROJECT EVALUATION AND REVIEW TECHNIQUE (PERT) IN THE HOUSE CONSTRUCTION PROJECT IN THE MALIMIMPLEMENTATION OF PROBUKAN PERMAI III HOUSING AREAS IN NORTH MINAHASA REGENCY

Read full text
Authors: Nuraini Retnaningrum Sukamta, Jacky SB Sumarauw, Merlyn Mourah Karuntu, Magdalena Wullur, Ferdinand J Temewu, Shinta Jeanete Camelia Wangke
Cited by: 0

Abstract

Previous studies have shown that the Critical Path Method (CPM) and the Project Evaluation and Review Technique (PERT) are effective in optimizing project completion time. Based on observations, the construction of a single housing unit typically requires 64 working days. This study aims to obtain an optimal scheduling result by applying CPM and PERT to the construction project of a subsidized house type-36 in Perumahan Malimbukan Permai III, North Minahasa Regency. The analysis results indicate that the project’s critical path consists of A – B – C – D – E – F – H – K – L – M – N – P – Q. Using the CPM method, the required completion time is 55 days, while the PERT method yields an estimated 55.68 days. With a deadline of 60 days, the probability of completing the project is 99.94%. This study highlights the importance of monitoring the critical path and utilizing time estimation in project planning to prevent delays and unforeseen obstacles.

Fields of Study & Subjects

Resource-Constrained Project Scheduling Construction Project Management and Performance Management and Optimization Techniques

Publication details

Journal / source
Multidisciplinary Indonesian Center Journal
Volume
3
Issue
1
Pages
908–922
Publication date
15 January 2026