Time and Resource Management in Sustainable Interior Architecture Projects

Read full text
Authors: Alauddin Saira, Islam Md.Tajul, Shabid Golam Morshad, Mannan Kazi Abdul
Cited by: 0
References: 8

Abstract

Effective time and resource management sits at the intersection of sustainability, design performance, and project success in interior architecture. Sustainable interior architecture projects—characterised by material stewardship, energy efficiency, adaptive reuse, and occupant wellbeing—introduce unique constraints and opportunities for project managers, designers, contractors, and clients. This article examines how time and resource management practices influence sustainability outcomes in interior architecture through a qualitative inquiry framed by stakeholder theory and principles from lean project delivery and sustainable design. Drawing on semi-structured interviews with 18 professionals (interior architects, project managers, contractors, and sustainability consultants) and two in-depth case studies, thematic analysis reveals five major themes: integrated planning and early sustainability decision-making; material procurement and circular resource strategies; schedule flexibility and phased implementation; stakeholder alignment and communication; and tools and metrics for monitoring sustainability performance. Findings indicate that early integration of sustainability targets into the schedule, use of circular procurement strategies, adoption of lean planning methods (e.g., Last Planner System), and explicit allocation of time for verification and occupant engagement significantly improve both environmental performance and on-time delivery. Barriers include fragmented supply chains for sustainable materials, short lead times, and clients’ limited willingness to invest in front-loaded planning. The article concludes with practical recommendations for designers and project managers and suggests avenues for future research into hybrid delivery models that balance time efficiency with sustainability ambition. Keywords: sustainable interior architecture, time management, resource management, lean planning, circular procurement, qualitative research

Fields of Study & Subjects

Sustainable Building Design and Assessment Construction Project Management and Performance BIM and Construction Integration

Publication details

Journal / source
Sustainable Environment and Business
Volume
6
Issue
1
Pages
1–1
Publication date
14 March 2026
Language
EN