CSOptim: Assessing and Improving the Operation of Combined Sewer Overflow Structures

Read full text Summarise with VIRAT
Authors: Karim Sedki, Yannic Brüning, Ulrich Dittmer
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

Flow-dividing structures in combined sewer systems serve to mitigate hydraulic overloads during storm events by providing retention capacity. Their operational performance can be enhanced by adjusting the continuation flows regulated by their flow control devices. To optimise system efficiency to reduce emissions, it is essential to use existing volumetric capacities more efficiently, e.g. by adjusting continuation flows. To assess this potential, statistical analyses are conducted on water level measurements from combined sewer overflow (CSO) structures (e.g. frequency analyses) to derive meta information used to assess the baseline functioning. Meta information, such as weir heights, basin base areas and continuation flows, with higher accuracy than would be feasible through manual measurements in the structures or extraction from construction plans, are derived solely from measured water levels. Derived meta information is employed to isolate events to determine reliably CSO occurrence and duration. The continuation flows are optimised using an emulator coupled with a genetic algorithm, with the objective of achieving enhanced operational performance. The case study, which involved eight CSO structures, revealed improvements in efficiency. Overall system efficiency increased from the baseline functioning to the optimized operational setup through the static adjustment of the continuation flows within a range of +/- 50%.

Fields of Study & Subjects

Urban Stormwater Management Solutions Water Systems and Optimization Flood Risk Assessment and Management

Publication details

Journal / source
OJS-Service ULBT
Publication date
20 March 2026
Language
EN