Warehouse Project - Case Study - Project Planning Scheduling and Control

Read full text Summarise with VIRAT
Authors: Photios G. Ioannou
Cited by: 0

Summary

No summary yet. VIRAT can read this paper and write a plain-language summary of its aim, methods, key findings and limitations.

Summarise with VIRAT Free to try with your Science Catalogs account.

Abstract

You are the successful contractor for a warehouse project. Based on the original bidding documents, you have developed the activity list shown in Table 1 which includes the activity number, the activity name, the activity duration, the set of predecessor activities, and the daily resource requirements. The contract for this project requires completion within 28 working days after the Notice to Proceed and calls for liquidated damages for late completion at the rate of $1,000 per working day. The General Conditions of the contract include a clause identical to SP-13 of the U.S. Postal Service Specifications (shown below). Following contract award, you submitted a computer printout of your master schedule that shows completion of the work in 28 working days. At the time of the notice to proceed, the owner issues a Change Order and informs you that he has redesigned some of the work. The owner agrees to pay the additional costs caused by the Change Order but refuses to allow any time extension. At this point, you become concerned about possible resource availability. Each day you can only provide 4 carpenters (C), 4 ironworkers (I), and 4 laborers (L). Part 1 • Develop a schedule showing that you could complete the original project (before the Change Order) within 28 days without exceeding your resource availability constraints. • Why do you think the owner denied granting the revised project any time extension? Part 2 You now realize that you can no longer meet the 28-day schedule under the Change Order requirements. Thus, you accept the Change Order under protest, indicating that you do not agree with the owner’s denial of time extension. • How much time extension should you claim? Document your claim by producing a schedule using the revised activity duration estimates and subject to the above resource availability constraints. Knowing that this schedule will be challenged by the owner’s top engineering talent, you must develop the shortest schedule possible. • How much time extension should you claim if you could split activities?

Fields of Study & Subjects

Resource-Constrained Project Scheduling Construction Project Management and Performance BIM and Construction Integration

Publication details

Publication date
24 March 2026
Language
EN